Description
Structure contains following:
- Two pipes (4”) of 8 feet with base plate.
- Two pipes (4”) of 7 feet with base plate
- 4 girders (14 gauge) 12 feet.
- 2 girders (14 gauge) 15 feet.
It also include Paint and Cement (for civil work).
Further red oxide is already applied.